«Previous    Next»
Shop-Built Steel Boxes Hold Sickle Repair Machine
Don Kirby, Lamont, Okla.: "When I poured my shop floor, I installed two shop-built steel boxes out of angle iron and flat metal in the floor to hold our sickle repair machine. It allows the sickle to lay flat on the floor when replacing sections and installing rivets. It makes repairs much easier than when we had to put the sickle up on blocks to line it up level with the sickle machine."


  Click here to download page story appeared in.



  Click here to read entire issue




To read the rest of this story, download this issue below or click here to register with your account number.
Order the Issue Containing This Story
1998 - Volume #22, Issue #5